Electromagnetic Field 2020 has been cancelled due to the COVID-19 pandemic. We will return as scheduled in summer 2022.

All ticketholders will be eligible for a full refund and a guaranteed ticket to our next event. For more information, please see our blog post.

Team:Power: Difference between revisions

From Electromagnetic Field 2020
Jump to navigation Jump to search
(Created page with "{{Infobox Team |name=Power |desc=All things to do with powering the site. Also responsible for basic site & emergency lighting. |lead=User:Benny |MailingList=https://lists.emf...")
 
m (JonWood moved page Team:Power to Team:Site: Power has been consumed by the Site team.)
(No difference)

Revision as of 20:32, 20 January 2020

Power
All things to do with powering the site. Also responsible for basic site & emergency lighting.
Lead(s) Benny
Mailing List https://lists.emfcamp.org/listinfo/power


All things to do with powering the site. Also responsible for basic site & emergency lighting.

Team members

UserNameArrivalDeparture
DpslwkMatt
JamieJamie Scott
JosshJosh C

(refresh table)

We Need People to Help With

  • Helping plan the power infrastructure
  • Laying out power during build-up (no experience needed)
  • Helping tear down power after the event (no experience needed, but it’s exhausting)