Difference between revisions of "Team:Power"

From Electromagnetic Field
Jump to navigation Jump to search
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
 
{{Infobox Team
 
{{Infobox Team
 
|name=Power
 
|name=Power
|desc=Power
+
|desc=All things to do with powering the site. Also responsible for basic site & emergency lighting.
 +
|lead=User:Benny
 
|MailingList=https://lists.emfcamp.org/listinfo/power
 
|MailingList=https://lists.emfcamp.org/listinfo/power
 
}}
 
}}
Line 9: Line 10:
  
 
{{TeamUserList}}
 
{{TeamUserList}}
 +
 +
== We Need People to Help With ==
 +
* Helping plan the power infrastructure
 +
* Laying out power during build-up (no experience needed)
 +
* Helping tear down power after the event (no experience needed, but it’s exhausting)

Latest revision as of 19:07, 22 July 2018

Power
All things to do with powering the site. Also responsible for basic site & emergency lighting.
Lead(s) Benny
Mailing List https://lists.emfcamp.org/listinfo/power


All things to do with powering the site. Also responsible for basic site & emergency lighting.

Team members

UserNameArrivalDeparture
ChrisTheBaronChris Taylor
DpslwkMatt23 August 2018 19:00:006 September 2018 12:00:00
ElectronicsLaurie27 August 2018 14:00:004 September 2018 17:00:00
JamieJamie Scott
JoshJosh
M0LTSLaurence Stant27 August 20184 September 2018
RussRuss23 August 2018 19:00:006 September 2018 12:00:00
Will-hWill Hargrave31 August 201631 August 2020

(refresh table)

We Need People to Help With

  • Helping plan the power infrastructure
  • Laying out power during build-up (no experience needed)
  • Helping tear down power after the event (no experience needed, but it’s exhausting)