Difference between revisions of "Team:Power"

From Electromagnetic Field
Jump to navigation Jump to search
(Created page with "{{Infobox Team | Picture = | name = Power | desc = Power | lead = | email = | needvolunteers = | Location= }} == Team members == {{TeamUserList}}")
 
 
(8 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
{{Infobox Team
 
{{Infobox Team
| Picture =
+
|name=Power
name = Power
+
|desc=All things to do with powering the site. Also responsible for basic site & emergency lighting.
| desc = Power
+
|lead=User:Benny
| lead =  
+
|MailingList=https://lists.emfcamp.org/listinfo/power
| email =
 
|  needvolunteers =
 
|  Location=
 
 
}}
 
}}
 +
All things to do with powering the site. Also responsible for basic site & emergency lighting.
  
 
== Team members ==
 
== Team members ==
  
 
{{TeamUserList}}
 
{{TeamUserList}}
 +
 +
== We Need People to Help With ==
 +
* Helping plan the power infrastructure
 +
* Laying out power during build-up (no experience needed)
 +
* Helping tear down power after the event (no experience needed, but it’s exhausting)

Latest revision as of 19:07, 22 July 2018

Power
All things to do with powering the site. Also responsible for basic site & emergency lighting.
Lead(s) Benny
Mailing List https://lists.emfcamp.org/listinfo/power


All things to do with powering the site. Also responsible for basic site & emergency lighting.

Team members

UserNameArrivalDeparture
ChrisTheBaronChris Taylor
DpslwkMatt23 August 2018 19:00:006 September 2018 12:00:00
ElectronicsLaurie27 August 2018 14:00:004 September 2018 17:00:00
JamieJamie Scott
JoshJosh
M0LTSLaurence Stant27 August 20184 September 2018
RussRuss23 August 2018 19:00:006 September 2018 12:00:00
Will-hWill Hargrave31 August 201631 August 2020

(refresh table)

We Need People to Help With

  • Helping plan the power infrastructure
  • Laying out power during build-up (no experience needed)
  • Helping tear down power after the event (no experience needed, but it’s exhausting)