Difference between revisions of "Site Search"

From Electromagnetic Field
Jump to navigation Jump to search
Line 5: Line 5:
 
* Good transport links
 
* Good transport links
 
* Good access to setup vehicles (no low bridges)
 
* Good access to setup vehicles (no low bridges)
* Water supply
+
* Some kind of water supply/sewage connection
 
* Well drained
 
* Well drained
 
* Space for parking
 
* Space for parking
Line 12: Line 12:
  
 
* Existing electricity supply (it's probably more hassle than providing it ourselves)
 
* Existing electricity supply (it's probably more hassle than providing it ourselves)
*
 
  
 
=Candidate Sites=
 
=Candidate Sites=

Revision as of 00:45, 5 April 2013

The biggest issue for EMF is to find a good site. Here are our requirements, in order of priority:

  • Space for at least 1500 people (3-8 hectares/8-15 acres/0.03-0.06 sq km)
  • Ability to get a good internet connection (1 gigabit+)
  • Good transport links
  • Good access to setup vehicles (no low bridges)
  • Some kind of water supply/sewage connection
  • Well drained
  • Space for parking

We don't care about:

  • Existing electricity supply (it's probably more hassle than providing it ourselves)

Candidate Sites

Site Name Details
Colerne Airfield, Wiltshire (nr Bath) Owned by a company of a friend of London Hackspace