Difference between revisions of "Site Search"

From Electromagnetic Field
Jump to navigation Jump to search
Line 1: Line 1:
 
The biggest issue for EMF is to find a good site. Here are our requirements, in order of priority:
 
The biggest issue for EMF is to find a good site. Here are our requirements, in order of priority:
  
* Space for at least 1500 people (3-8ha)
+
* Space for at least 1500 people (3-8 hectares/8-15 acres/0.03-0.06 sq km minimum)
 
* Ability to get a good internet connection (1 gigabit+)
 
* Ability to get a good internet connection (1 gigabit+)
 
* Good transport links
 
* Good transport links

Revision as of 00:39, 5 April 2013

The biggest issue for EMF is to find a good site. Here are our requirements, in order of priority:

  • Space for at least 1500 people (3-8 hectares/8-15 acres/0.03-0.06 sq km minimum)
  • Ability to get a good internet connection (1 gigabit+)
  • Good transport links
  • Good access to setup vehicles (no low bridges)
  • Water supply
  • Well drained
  • Space for parking

We don't care about:

  • Existing electricity supply (it's probably more hassle than providing it ourselves)

Candidate Sites

Site Name Details
Colerne Airfield, Wiltshire Owned by a company of a friend of London Hackspace